ENTSO-E Consultations Archive

​​​​​​​​​​​​​​​ In accordance with Article 10 (1) of Regulation (EC) 714/2009, ENTSO-E holds public consultations at an early stage and in an open and transparent manner on all draft network codes, ten-year network development plans (TYNDPs) and its annual work program. Public consultations on other deliverables are launched if need be.

All consultations are announced on this website and via the ENTSO-E News Alert. Interested stakeholders are recommended to register for notification of the commencement of formal consultations.

An overview of all consultations is provided below. To access an open or closed consultation follow the corresponding links as indicated in the table.

All consultations must be answered via the ENTSO-E Consultation Hub.

For an explanation of the below table, please click here.

Before consultation hub

To view the archive of public consultations please consult our consultation hub using the button below.

ENTSO-E Consultation Hub archive

Consultation Background & DocumentsConsultation PeriodConsultation Access & Status
​2017
​​Stakeholder Satisfaction Survey 201611 Jan 2017 - 5 Feb 2017​Closed​
​​​“FCR cooperation” potential market design evolutions9 Jan 2017 - 10 Feb 2017​Closed​
​​​Harmonised Allocation Rules for long-term Transmission Rights​​16 Jan 2017 - 17 Feb 2017​Closed
​2016
Fallback procedures for the South West Europe Region Capacity Calculation Region​18 November 2016 - 19 December 2016​Closed
Fallback procedures for the Italy North Region Capacity Calculation Region​17 November 2016 - 19 December 2016Closed​
​​​Channel and IU regions; CACM fallback procedures - public consultation

​​14 October 2016 - 15 November 2016

​Closed
All TSOs’ proposal on ID Scheduled Exchanges Calculation Methodology​​04 October 2016 - 06 November 2016​​Closed
All TSOs’ proposal on DA Scheduled Exchanges Calculation Methodology​​​04 October 2016 - 06 November 2016Closed
Request for input: Going from assumptions to figures - TYNDP 2018 gas and electricity scenarios​20 September 2016 - 10 October 2016​Closed
Annual Work Programme 2017​17 August 2016 - 19 September 2016​Closed
Mid term adequacy forecast (MAF 2016)​29 July 2016 - 29 September 2016​Closed
ENTSO-E Connection Codes Implementation Guidance Documents​1 July 2016 - 15 August 2016​Closed
TYNDP 2016​23 June 2016 - 9 September 2016​Closed
Joint ENTSO-E and ENTSOG consultation: Build Europe’s future scenarios​12 May 2016 - 12 June 2016​Closed
Shape the next European Cost Benefit Analysis Methodology (CBA 2.0)​25 April 2016 - 31 May 2016​Closed
​Research & Innovation Roadmap 2017-2026​3 May 2016 - 24 May 2016​Closed
All TSOs’ proposal for the day-ahead firmness deadline (DAFD)​18 April 2016 - 18 May 2016​Closed
Next European Cost Benefit Analysis Methodology (CBA 2.0)​25 April 2016 - 31 May 2016​Closed
Harmonised Allocation Rules for Forward Capacity Allocation​28 April 2016 - 18 May 2016​Closed
Intraday cross-zonal gate opening and gate closure times​18 April 2016 - 18 May 2016Closed
Public consultation for the design of the TERRE (Trans European Replacement Reserves Exchange)​7 March 2016 - 8 April 2016​Closed
Consultation on the Common Grid Model Methodology and the Generation and Load Data Provision Methodology​4 February 2016 - 4 March 2016​Closed
​​Stakeholder Satisfaction Survey 201520 January 2016 - 5 February 2016​​Closed
​2015 ​ ​
Consultation on version 2 of ENTSO-E Conformity Assessment Scheme for CGMES​​17 December 2015 - 15 January 2016​Closed
ENTSO-E survey on priority issues for Connection Network Codes implementation guidance​​15 December 2015 - 22 January 2016​Open
​Cost benefit analysis for the Imbalance Settlement Period​13 November 2015 - 14 January 2016​Closed
Implementation of CACM: Capacity calculation regions​24 August - 24 September 2015​Closed
Annual Work Programme 2016​24 August - 24 September 2015​Closed
TYNDP 2016 Regional Investment Plans​24 June - 10 September 2015​Closed
TYNDP 2016 candidate projects​24 June - 10 September 2015​Closed
TYNDP 2016 Scenario Development Report​21 May - 22 June 2015​Closed

Recommendations relating to the coordination of technical cooperation between Community and third-country TSOs

​20 May - 31 July 2015​Closed
Harmonised Allocation Rules for forward capacity allocation​2 Mar - 30 Mar 2015​Closed
Network Code Electricity Balancing: Public Consultation on the Methodology for Cost Benefit Analysis​23 Feb - 31 Mar 2015​Closed
Public Consultation on the ENTSO-E R&D Implementation Plan 2016-2018​4 Feb - 24 Feb 2015​Closed
2014​ ​ ​
Network Code on Emergency and Restoration​15 Dec 2014 - 14 Jan 2015​Closed
Joint Public Consultation ACER/ENTSO-E on the establishment of European Network Code Stakeholder Committees​11 Dec 2014 - 23 Jan 2015 ​Closed
Network Code on Emergency and Restoration

 13 Oct - 8 Dec 2014

Closed
System Adequacy Methodology​14 July - 19 Sep 2014​Closed
Ten-Year Network Development Plan 2014​10 Jul - 20 Sep 2014​Closed
ENTSO-E Draft Annual Work Programme
2014-2015
​04 Jul - 29 Aug 2014​Closed
​2013
ENTSO-E Draft R&D Implementation Plan 2015-201726 Nov - 17 Dec 2013Closed
Network Code on HVDC Connections (NC HVDC)07 Nov - 07 Jan 2014Closed
TYNDP 2014-2030 Visions19 Jul - 20 Sep 2013Closed
ENTSO-E Draft Annual Work Programme 2013-201403 Jul - 06 Sep 2013Closed
Cost Benefit Analysis Methodology03 Jul - 15 Sep 2013Closed
Manual of Procedures for the ENTSO-E Central Information Transparency Platform01 Jul - 12 Aug 2013Closed
Network Code on Electricity Balancing (EB)17 Jun - 16 Aug 2013Closed
Network Code on Forward Capacity Allocation (FCA)28 Mar - 28 May 2013Closed
Network Code on Load Frequency Control and Reserves (LFCR) 1 Feb - 2 Apr 2013Closed
2012
Network Code on Operational Planning and Scheduling (OPS)7 Nov 2012 - 7 Jan 2013Closed
R&D Roadmap 2013-202217 Sep - 15 Oct 2012Closed
Operational Security Network Code3 Sep - 3 Nov 2012Closed
The ENTSO-E Annual Work Program6 Jul – 3 Sep 2012Closed
Demand Connection Code27 Jun – 12 Sep 2012Closed
TYNDP 2012 Package – TYNDP 2012 report1 Mar – 26 Apr 2012Closed
Capacity Allocation and Congestion Management Network Code23 Mar – 23 May 2012Closed
TYNDP 2012 Package – RegIP Baltic Sea1 Mar – 26 Apr 2012Closed 
TYNDP 2012 Package – RegIP Continental South East1 Mar – 26 Apr 2012Closed
TYNDP 2012 Package – RegIP Continental Central East1 Mar – 26 Apr 2012Closed
TYNDP 2012 Package – RegIP Continental South West1 Mar – 26 Apr 2012Closed
TYNDP 2012 Package – RegIP Continental Central South1 Mar – 26 Apr 2012Closed
TYNDP 2012 Package – RegIP North Sea1 Mar – 26 Apr 2012Closed
TYNDP 2012 Package – Scenario Outlook & Adequacy Forecast1 Mar – 26 Apr 2012Closed
Network Code for Requirements for Grid Connection applicable to all Generators24 Jan – 20 Mar 2012Closed
2011
Work Program 2011-121 Jul – 2 Sep 2011Results available
Study Roadmap MoDPEHS2 May – 3 Jun 2011Results available
TYNDP 2012 Scenarios16 Feb – 15 Mar 2011Results available
2010
Work Program 2010-111 Jul – 2 Sep 2010Results available
Operation Handbook21 May – 2 July 2010Results to be made available
TYNDP 20101 Mar – 11 Apr 2010Results available
R&D Plan 201011 Jan – 22 Feb 2010Results available
2009
Work program 2009-201030 Sep – 30 Nov 2009Results available
Consultation process30 Sep – 30 Nov 2009Results available
GET THE MOST POWERFUL NEWSLETTER IN BRUSSELS