On this page

 

Capacity Calculation Regions

Apr 1, 2019
Following the amendment submitted in May 2018 by the TSOs, on 2 October 2018, all regulatory authorities have sent a letter to ACER, requesting to adopt a decision on this ‘second proposal for amendment’. In February 2019 ACER adopted a decision on the second proposal for amendment in March 2019.

Sep 18, 2017
All NRAs agreement to approve the all TSOs’ proposal for an amendment to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Jul 21, 2017
All TSOs’ deliver the amendment request to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Apr 7, 2017
All TSOs’ launch consultation on an amendment include the upcoming BE-GB interconnector in the decision on capacity calculation regions

Nov 17, 2016
ACER decision on the determination of capacity calculation regions

Nov 17, 2015
All TSOs’ proposal for the determination of capacity calculation regions is delivered


Baltic

[FCA] Methodology for splitting cross-zonal capacity

[FCA] Fallback procedures

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
11/08/2017
TSOs proposal deadline
17/09/2017
NRA approval deadline
18/03/2018
TSOs amendment deadline
16/05/2018
TSOs amendment final approval
21/05/2018
NRA approval deadline
21/07/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
20/01/2018
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
NRA final approval
4/04/2018
NRA amendment final approval
4/04/2018

FCA Deliverables

A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
NRA final approval
4/04/2018
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Channel

[CACM] Capacity calculation methodologies

CACM Art. 35 & 74 - Redispatching and countertrading methodology

CACM Art. 44 - Day-Ahead Fallback procedure

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
23/06/2017
TSOs proposal deadline
17/09/2017
NRA approval deadline
1/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/12/2017
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
NRA final approval
14/06/2017
NRA amendment final approval
14/06/2017

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
TSOs final submission
17/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Core

CACM deliverables

DA & ID CCMs (Art 20ff)

Fallback Procedures (Art 44)

RD & CT (Art. 35)

FCA deliverables

Core LTTRs (Art 31)

EU HAR Annex (Art 52)

Core CCR Program

Announcements (press-release, communication note etc.)

Core Consultative Group meetings

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA Escalation to ACER
20/07/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
NRA Escalation to ACER
8/03/2018

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
TSOs final submission
18/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope


Greece Italy (GRIT)

[CACM] Algorithm proposals (including DA and ID algorithm requirements)

[FCA] Methodology for splitting cross-zonal capacity

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/09/2017
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
8/02/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Hansa

[CACM] Algorithm proposals (including DA and ID algorithm requirements)

[FCA] Methodology for splitting cross-zonal capacity

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
15/06/2017
TSOs proposal deadline
17/09/2017
NRA approval deadline
15/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/12/2017
TSOs proposal deadline
17/03/2018
TSOs final submission
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
NRA final approval
14/12/2017
NRA amendment final approval
14/12/2017

FCA Deliverables

A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
Cluster
Geographical Scope
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
NRA final approval
21/03/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Italy North

[CACM] Capacity calculation methodology

[CACM] Coordinated redispatching and countertrading methodologies

[CACM] Algorithm proposals (including DA and ID algorithm requirements)

[FCA] Methodology for splitting cross-zonal capacity

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/09/2017
TSOs final submission
12/06/2018
NRA approval deadline
12/12/2018
NRA amendment request
NRA
TSOs amendment deadline
11/08/2019
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
TSOs final submission
7/02/2017
NRA amendment final approval
11/01/2018
A.21.1 Submit a proposal for a common D-2 capacity...
Full Title
Submit a proposal for a common D-2 capacity methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Ireland and United Kingdom (IU)

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
23/06/2017
TSOs proposal deadline
17/09/2017
TSOs final submission
1/09/2017
NRA approval deadline
1/03/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
12/01/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
NRA final approval
14/06/2017
NRA amendment final approval
14/06/2017

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
TSOs final submission
17/04/2017
NRA final approval
13/10/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

Nordic

[CACM] Algorithm proposals (including DA and ID algorithm requirements)

[FCA] Methodology for splitting cross-zonal capacity

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/04/2017
TSOs proposal deadline
17/09/2017
TSOs final submission
15/09/2017
NRA approval deadline
15/03/2018
NRA amendment request
NRA
TSOs amendment deadline
17/05/2018
NRA approval deadline
16/07/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
2/01/2018
TSOs proposal deadline
17/03/2018
TSOs final submission
16/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016
NRA final approval
16/03/2018
TSOs amendment final approval
17/01/2018
NRA amendment final approval
16/03/2018

FCA Deliverables

A 16.1 Develop a proposal for a methodology for splitting...
Full Title
Develop a proposal for a methodology for splitting long-term cross-zonal capacity
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
A 30.2 NRA decision on implementation of LTR - in...
Full Title
NRA decision on implementation of LTR - in case no LTRs exist at entry into force
Responsible
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
NRA final approval
18/04/2018
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

South East Europe

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
13/11/2017
TSOs proposal deadline
17/09/2017
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
2/02/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope

South West Europe

[CACM] Capacity calculation methodologies

[CACM] Coordinated redispatching and countertrading methodologies

[CACM] Intraday complementary auctions

[CACM] Algorithm proposals (including DA and ID algorithm requirements)

[FCA] Methodology for splitting cross-zonal capacity

[FCA] Harmonised allocation rules for long-term transmission rights

CACM Deliverables

A 20.2 Submit a proposal for a common coordinated capacity...
Full Title
Submit a proposal for a common coordinated capacity calculation methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
1/06/2017
TSOs proposal deadline
17/09/2017
NRA approval deadline
14/03/2018
TSOs amendment deadline
14/05/2018
TSOs amendment final approval
9/05/2018
NRA approval deadline
14/07/2018
A 35.1 Develop proposal for redispatching methodology
Full Title
Develop proposal for redispatching methodology
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs Draft Proposal For Consultation
24/01/2018
TSOs proposal deadline
17/03/2018
A 35.3 Develop a report assessing the progressive coordination and...
Full Title
Develop a report assessing the progressive coordination and harmonisation of RD and CT mechanisms and agreements
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/01/2019
A 44 Develop a proposal for robust and timely fallback...
Full Title
Develop a proposal for robust and timely fallback procedures
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
15/12/2016

FCA Deliverables

A 31.3 Develop a proposal for the regional design of...
Full Title
Develop a proposal for the regional design of long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
TSOs proposal deadline
17/04/2017
NRA final approval
17/10/2017
A 51.1 Develop a proposal for harmonised allocation rules for...
Full Title
Develop a proposal for harmonised allocation rules for long-term transmission rights
Responsible
TSOs of CCR (capacity calculation region)
Cluster
Geographical Scope
GET THE MOST POWERFUL NEWSLETTER IN BRUSSELS