CNC - Implementation Guidance Documents

Implementation Guidance Documents

Below you will find the latest published implementation guidance documents for the connection network codes.

  1. Automatic connection/reconnection and admissible active power ramp in (updated 2021)
  2. Compliance Verification – Compliance Testing and use of Equipment Certificates (updated 2021)
  3. Cost-benefit analysis
  4. Demand Response – System Frequency Control (updated 2021)
  5. Embedded HVDC systems – frequency schemes in case of system split
  6. Fault current contribution from PPMs & HVDC converters
  7. Frequency Ranges (updated 2021)
  8. Frequency Sensitive Mode
  9. HVDC systems default parameters
  10. Harmonisation
  11. High Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS)
  12. Instrumentation, simulation models and protection
  13. Interactions between HVDC systems and other connections
  14. Limited Frequency Sensitive Mode
  15. Making non-mandatory requirements at European level mandatory in a country
  16. Maximum Admissible active power reduction at low frequencies (updated 2021)
  17. Need for synthetic inertia for frequency regulation
  18. Parameters of non-exhaustive requirements (updated 2021)
  19. Parameters related to frequency stability
  20. Post fault active power recovery
  21. Rate-of-change-of-frequency withstand capability (RoCoF)
  22. Reactive power control modes
  23. Reactive power management at transmission/distribution interface
  24. Reactive power requirement for PPMs & HVDC converters at low / zero active power
  25. Real time data and communication
  26. Selection of national parameters for RfG type classification
  27. Special issues for Type A generators
  28. Voltage related parameters for non-exhaustive requirements

Archives (old versions of IGDs)

  1. Automatic connection/reconnection and admissible active power ramp in (version 2018)
  2. Compliance monitoring (version 2017)
  3. Demand Response – System Frequency Control (version 2018)
  4. Frequency Ranges (version 2018)
  5. Maximum Admissible active power reduction at low frequencies (version 2018)
  6. Parameters of non-exhaustive requirements (version 2016)

Relevant replies to the public consultations

Consultation period: 02/12/20 - 31/01/21

GET THE MOST POWERFUL NEWSLETTER IN BRUSSELS