​​​The Network Code on Requirements for Generators is seen as one of the main drivers for creating harmonised solutions and products necessary for an efficient pan-European (and global) market in generator technology. The purpose of this network code is to bring forward a set of coherent requirements in order to meet these challenges of the future.​​

Status Update (April 2016)

NC Requirements for Generators published in Official EU Journal

NC RfG is now published in the European Union Official Journal and will become a binding EU regulation as of 17 May.

View the RfG Network Code​​


Status Update (December 2015)

On 26 June 2015, the Network Code on Requirements for Generators was adopted by Member States in Comitology. RfG will now go through scrutiny from the European Parliament and Council. 

Download the final draft ​​Network Code on Requirements for Generators

ENTSO-E has published implementation guidelines for the NC RfG, to support the code by highlighting the impact on specific technologies, the link with local network characteristics, as well the need for coordination between network operators and grid users. 

An overview of the latest developments for all network codes is available.

Archive​​​​

Documents submitted to Acer - March 2013:

The final NC RfG package as submitted in July 2012

 

Upcoming and Past Events Archive

The tables and links below will serve as an archive for reference purposes of all previously released material and stakeholder meetings that took place during the development of the network code RFG.

 

Stakeholder Discussions

Date

Meeting

Documents

07/03/13

Public information session

Agenda
Presentations

16/01/13

User Group

Minutes
Presentations

20/12/12

COGEN Europe/EHI

Minutes
Presentations

22/11/12

User Group

Minutes
Documents

22/11/12

DSO Technical Expert Group

Minutes
Presentations

28/06/12

User Group

Minutes and Presentations

02/05/12

User Group 

Minutes
Documents

17/04/12

DSO Technical Expert Group

Minutes
Documents

22/03/12

User Group

Agenda Proposals
Presentations
Final Minutes

09/01/12

EPIA

Minutes
Presentations

20/12/11

Eurelectric WG Thermal/VGB Power Tech and EUTurbines

Minutes
Presentations

07/12/11

DSO Expert Group consisting of members from Eurelectric DSO, Cedec and Geode

Minutes

06/12/11

EWEA

Minutes

Presentations ENTSO-E

10/11/11

EUR

Minutes
Presentations ENTSO-E

22/08/11

DSO Technical Expert Group

Minutes

Public Stakeholder Workshops

Date

Workshop

Documents

10/03/12

Public consultation

Web-based consultation on the NC RfG 14/01 – 20/03/2012

15/02/12

mid-Consultation

Consultation workshop on the NC RfG

11/12/11

Regional/TYNDP

NC RfG Regional workshops held in conjunction with TYNDP Workshops

Related Documents and Links Pilot Code Phase

 