All TSOs' proposal for a Common Grid Model Methodology and a Generation and Load Data Provision Methodology under Regulation 2016/1719 released for public consultation

Following the drafting of the Generation and Load Data Provision Methodology (GLDPM) and the Common Grid Model Methodology (CGMM) required by Article 16 and Article 17, respectively, of Regulation 2015/1222 by “All TSOs”, the GLDPM was approved by “All NRAs” on 11 January 2017. The CGMM is in the process of being resubmitted by each TSO to its NRA following the incorporation of changes set out in the NRAs’ amendment request of 11 January 2017.

Article 17 and Article 18, respectively, of Regulation 2016/1719 set out additional requirements with respect to the GLDPM and the CGMM which the drafting team has now incorporated into the documents. The revised GLDPM (GLDPM-v2) and revised CGMM (CGMM-v2) have now been approved for public consultation by “All TSOs” and are available from the ENTSO-E consultations hub.

GLDPM-v2 Consultation CGMM-v2 Consultation