ENTSO-E welcomes this consultation and has contributed with a response on 13 May. ENTSO-E has highlighted two areas of concern in the draft priority list:

  1. The on-going work related to the implementation of the network codes;
  2. The current formulation of the future work on tariffs/incentives, which leaves the incentive measures out of the priority list for 2014.

Download the full ENTSO-E response and the EC Public consultation paper through the links below.

Related Links